dong Mawankeng -

Rope rigged in stream bed, 10m pitch followed by 28m free hang. Horizontal passage at bottom for 40m then next pitch, 5m to Y-hang 17m to floor. Upstream 130m of walking passage to a duck (not passed). Downstream 30m leads to 5m climb to pool then cascade followed by another 5m climb and 12m pitch into deep pool. Across the pool there is a 6m climb and a 16m pitch. 85m of passage leads to a gravel choke although there are high level passages throughout. It also appears water backs up to a high level in wet weather.



Analyse :

523 caractères - Lu 38 Fois




Recherche